This particular rail cutting was deemed to be a constant problem site. It consisted of two benched slopes – the upper bench at 8m high and the lower bench at around 7m high consisting of isolated boulders.
A rockfall analysis was conducted to ensure the correct positioning of the fence and determining bounce heights throughout the cutting. At the time when GSS installed the 100kj fence, it was the first of its kind produced by Macceferri “™” to be installed in Australia.
GSS has continued to develop safe and reliable systems to ensure the continuity of installing such barriers.
Boolaroo Batter Stabilisation Works
Our full list of Services can be found here.
Our list of projects can be found here.
See our Covid 19 Policy Here